Call on all employees to learn from Yun Yunxing and Yang Fengjun

Release time:

2008-05-25

On May 12, 2008, a strong earthquake of magnitude 8.0 occurred in Wenchuan County, Sichuan Province. Affected by the earthquake, Deyang City, where China Second Heavy Machinery Group Corporation (hereinafter referred to as Erzhong) is located, water, power, and gas were cut off, communications and external traffic were interrupted, shops, banks, and post offices were closed, and Erzhong was completely suspended. At the time of the earthquake, two comrades, Yun Yunxing and Yang Fengjun, were carrying out the equipment supervision tasks of the 4100mm wide plate project of Chongqing Iron and Steel Environmental Protection Relocation Project and the Turkish TOSYALI950mm Hot Strip Rolling Project. In the face of the sudden disaster and the difficulties and dangers caused by the earthquake, the two comrades did not fear or flinch. They focused on their work and stuck to their posts.

On the night of the earthquake, they risked the possibility of aftershocks at any time and entered the Erzhong plant to inspect and understand the situation of the Erzhong disaster. On the 13th, as soon as the communication was restored, the double disaster and other situations were immediately reported to the company in detail. In the following days, double organization to carry out production self-help. During the day, on behalf of the company, they expressed condolences to the leaders and personnel of the relevant departments of Erzhong and understood each other's needs for earthquake relief. Timely follow up and understand the damage degree, repair situation and pit exit time of 4100mm wide plate rolling mill arch sand mold, timely understand the design progress of Turkey TOSYALI950mm hot continuous rolling project, drawing and warehousing, etc., also visited two double subcontracting enterprises of Dongfang Electric Machinery Factory and Lida Electromechanical Equipment Company to understand the disaster and production recovery of the enterprises. In the evening, they overcame many difficulties such as the lack of relief supplies, and were under the tremendous mental pressure of aftershocks at any time, sleeping out with the employees and family members of the Erzhong Group.

Before the earthquake, ordering units in Beijing, Shanghai, Shandong, Northeast and other places sent equipment supervisors to Erzhong. After the resumption of external traffic in Deyang City, most of these supervisors were evacuated from Deyang. In order to ensure the safety of comrades Yun Yunxing and Yang Fengjun, the company's leaders repeatedly proposed to transfer them to Chengdu or Chongqing as soon as possible. However, the two of them said that Chongqing Iron and Steel's environmental relocation and Turkey's TOSYALI project were the company's key projects in 2008. Whether the equipment supervision task can be completed on time and with good quality has a great impact on the company. At this moment, the two of them are a good communication bridge between the company and Erzhong. Assisting in the post-earthquake recovery work is to do their part for the people in the disaster area. As the company's representative, they should fully demonstrate the good image of the company's employees., Work together with the employees of Erzhong and tide over the difficulties together. To this day, these two comrades still stick to their posts in the disaster area.

It is precisely because two comrades, Yun Yunxing and Yang Fengjun, took risks and overcame many difficulties to stick to their front-line posts in the disaster area, and timely reported the production self-rescue situation after the second earthquake to the company, which provided an important basis for the company's leaders to make rapid decisions and deploy relevant work, and strongly supported the self-rescue work of the second production. As a result, the leaders and employees of Erzhong were deeply moved, the key nodes of the project implementation were ensured, and a solid foundation was laid for the completion of the contracted construction tasks of the 4100mm wide plate project of Chongqing Steel and the TOSYALI950mm hot strip rolling project of Turkey on schedule.

On May 21, Erzhong completed the pouring of the second memorial arch of the 4100mm finishing mill of Chongqing Iron and Steel Co., which was the first large piece of equipment processed by Erzhong after resuming production.

After the Wenchuan earthquake, the two comrades Yun Yunxing and Yang Fengjun showed their dedication, fearlessness, and tenacious fighting spirit, which won the respect of the dual leaders and employees, and fully demonstrated the good image of the company's employees. At the same time, they Strong sense of ownership, sense of responsibility and selfless dedication are more worthy of learning from all employees of the company.

Strengthen school-enterprise exchanges and seek common cooperation and development

On May 16, Wang Chuanqing, general manager of Guoye Ruicheng, Wang Xinjiang, deputy general manager, Wang Dongmei, manager of the comprehensive department, and others visited Beijing University of Posts and Telecommunications for exchange. The United Humanities College held a special exchange meeting on campus in the teaching building. Liu Chengqun, deputy dean of the School of Humanities, senior director of the Student Affairs Office, graduating class counselor Wang Jingqi, and student representatives of all grades attended the event.

2023-05-24

China Metallurgical Engineering Co., Ltd.was invited to attend the inaugural meeting of Beijing Cangzhou Enterprise Chamber of Commerce.

On March 18, 2023, Zhang Jie and Wang Xinjiang, deputy general managers of China Metallurgical Engineering, were invited to attend the inaugural meeting of Cangzhou Enterprise Chamber of Commerce in Beijing as representatives of member units.

2023-03-20

Public Announcement on China Metallurgical Engineering Co., Ltd. Participating in the Application of 2022 Equipment Supervision Science and Technology Award

According to the document of china association of equipment supervision (zhongshe xietong zi [2022] No. 12) and the notice on the application of 2022 equipment supervision science and technology award, China Metallurgical Engineering Co., Ltd. has decided to select the "striver" manned submersible project with the participation of the technology development department as the participating project, and the application award grade is the first prize, which is hereby announced.

2022-07-07