Project Name Execution time Remarks
Bolivia ESM Integrated Steel Plant-Steel Tie Project-Construction Process Budget Control 2023.08- In execution
Russia MMK Coking Project-Budget Control of the Whole Construction Process 2021.12- In execution
Cangzhou vertical and horizontal oxygen production project-budget control of the whole construction process 2022.11- In execution
Huaibei coal gangue building materials comprehensive utilization project-engineering quantity calculation and settlement 2023.05- In execution
Fujian Longgang pellet-budget control of the whole construction process 2022.03- In execution
Indonesia Dexin 1.3 million Tons Coking Project-Coking System Construction and Safety Settlement 2022.12- In execution
Algeria Steel Rolling Project-Budget Control of the Whole Construction Process 2022.05- In execution
Hubei Youke Coking Project-Budget Control and Settlement of the Whole Construction Process 2022.01- In execution
Demonstration Project of Hydrogen Energy Development and Utilization Project of Hebei Zhangxuan High-tech Technology Co., Ltd.
(Annual output of 550000 tons of high quality deoxygenated pellets project)-Budget control and settlement of the whole construction process.
2021.06- In execution
Shaanxi Hanzhong Iron and Steel Group Co. 2021.06- Project Pause
Algeria Mineral Processing Project (Phase II)-Budget Control and Settlement of the Whole Construction Process 2023.06- In execution
Maanshan Iron and Steel Co., Ltd. Ironmaking General Plant (Southern District) Belt Roasting Machine Project-Budget Control and Settlement of the Whole Construction Process 2022.01-2023.06 has been put into production
Hydrogen-rich carbon cycle blast furnace phase III project heating project (electric heating)-construction whole process budget control and settlement. 2022.01-2023.06 has been put into production
Shanxi Hejin Hongda Steel Rolling Project-Construction Whole Process Budget Control. 2022.02-2023.06 has been put into production
New China Pelget Project-Budget Control and Settlement of the Whole Construction Process 2020.12-2022.03 has been put into production
Hejin Hongda Special Steel Co., Ltd. 2*100 Tons Converter Steelmaking Project-Budget Control and Settlement of the Whole Construction Process 2020.03-2020.11 has been put into production
Fujian Sangang Minguang Pelball Project-Project Settlement 2020.02-2020.11 has been put into production
Xinjiang Guotai Xinhua Power Plant Project-Project Settlement 2019.08-2019.12 has been put into production
Algeria Mineral Processing Project (Phase I)-Budget Control and Settlement of the Whole Construction Process 2019-2023.06 has been put into production
Liunan Flux (Phase I) Project EPC Project-Project Settlement 2018.11-2022.07 has been put into production
Algeria TOSYALI Long Belt Project-Budget Control and Settlement of the Whole Construction Process 2018.08-2023.06 has been put into production
Sangzhang Bridge Wind Project-Budget Control and Settlement of the Whole Construction Process 2018.07-2020.05 has been put into production
Hegang Leting Iron and Steel 2*4.8 million Tons Pelleting Project-Budget Control and Settlement of the Whole Construction Process 2018.07- has been put into production
Algeria TOSYALI Rolling Project-Engineering Settlement 2017.09-2017.12 has been put into production
Algeria AQS LMP Project-Budget Control and Settlement of the Whole Construction Process 2017.09-2019.12 has been put into production
Algeria TOSYALI Pelletting Project-Budget Control and Settlement of the Whole Construction Process 2017.04-2020.12 has been put into production
Algeria TOSYALI Steelmaking Project-Budget Control and Settlement of the Whole Construction Process 2017.02-2019.03 has been put into production
Algeria AQS DRI Project-Budget Control and Settlement of the Whole Construction Process 2017.01-2020.02 has been put into production
Algeria TOSYALI DRI Project-Budget Control and Settlement of the Whole Construction Process 2016.08-2020.12 has been put into production
Iron sintering ash resource utilization project-construction whole process budget control and settlement. 2016.05-2016.09 has been put into production
Cangzhou China Railway Equipment 2 × 300th Boiler Unit 5# and 6# Desulfurization and Denitrification Project General Contracting Project-Construction
Whole Process Budget Control and Settlement
2016.03-2016.03 has been put into production
West Shangzhuang 2*660MW low calorific value coal thermal power project engineering-construction whole process budget control and settlement 2016.02 so far Executing
Chengde 40000Nm ³/h Oxygen Station Project-Project Settlement 2015.06-2015.12 has been put into production
MINE ENGINEERING ALUMINA-BID BUDGET 2015.06-2015.08 has been put into production
WISCO Thermal Power Plant No.07 Power Station Reconstruction and Expansion General Contracting Project-Project Settlement 2015.02-2015.11 has been put into production
Shanxi Shouyang Ethylene Glycol Project-Budget Control and Settlement of the Whole Construction Process 2015.02-2019.01 has been put into production
Saudi villa project-budget control and settlement of the whole construction process. 2015.02-2015.12 has been put into production
Guangxi Coal Moisture-control Project-Project Settlement 2015.01-2018.01 has been put into production
Henan Ancai High-tech Waste Heat Power Generation Reconstruction Project-Project Settlement 2014.12-2015.02 has been put into production
Iran Zaland Integrated Steel Plant Project-Materials Plan 2014.09-2015.12 has been put into production
Tianjin Ronggang Sintering Project-Engineering Settlement 2014.09-2014.12 has been put into production
Chengde surplus gas power generation project-project settlement 2014.07-2014.12 has been put into production
Cangzhou vertical and horizontal coking project-construction whole process budget control and settlement. 2014.06-2016.03 has been put into production
Liugang Coke Dry Quenching 3 Coke and 4 Coke Project-Project Settlement 2014.04-2014.12 has been put into production
Ethiopia Sewage Treatment Plant-Bid Budget 2014.04-2014.05 has been put into production
Xinjiang Shankai Company Palgang Iron Mine 3.8 million t/a Concentrator Project-Budget Control and Settlement of the Whole Construction Process 2013.11-2016.05 has been put into production
Dingzhou Tianlu New Energy Co., Ltd. new coking project-construction whole process budget control and settlement. 2013.11-2014.12 has been put into production
Liugang medium rolling mill product structure adjustment technical transformation project (four bars and five or six bars)-project settlement. 2013.10-2014.05 has been put into production
Inner Mongolia Wastewater Treatment Plant-Bid Budget 2013.09-2013.10 has been put into production
Huoqiu 3 million tons of annual steel project-gas external network project-construction of the whole process of budget control and settlement. 2013.02-2017.05 has been put into production
Huoqiu 3 million tons of annual steel project-steel rolling project-construction whole process budget control and settlement. 2013.02-2017.05 has been put into production
Huoqiu 3 million tons of annual steel project-ironmaking project-construction whole process budget control and settlement. 2013.02-2017.05 has been put into production
Huoqiu 3 million tons of annual steel project-coking project-construction whole process budget control and settlement. 2013.02-2017.05 has been put into production
Egang sintering waste heat power generation project-project settlement 2012.09-2012.11 has been put into production
Egang surplus gas power generation project-project settlement 2012.07-2012.08 has been put into production