Typical Performance

undefined
+
  • undefined

Description

Project Name Execution time Remarks Participating departments
Xinjiang Bayi Steel Plant 2.2 million Tons Coking Project Complete Supervision Project 2006.11-2007.12 has been put into production  
Xinjiang Bayi Steel Plant 265m2 Sintering Project Complete Supervision Project 2006.11-2007.12 has been put into production  
Guangxi Liuzhou Iron and Steel Group New 2# Sintering Project Complete Supervision Project 2007.01-2007.12 has been put into production  
Cangzhou China Railway Vertical and Horizontal 2.2 million Tons 6 Meters Coking Project Complete Supervision Project 2007.06-2010.02 has been put into production  
Cangzhou China Railway Phase II 2, 3# 2350 M3 Blast Furnace Project Complete Supervision Project 2008.02-2010.09 has been put into production  
Handan Iron and Steel Co., Ltd. 2 million tons pellet project, vertical and horizontal pellet project complete supervision project 2008.04-2010.03 has been put into production  
Liugang CDQ Phase II Project Complete Supervision Project 2008.08-2010.01 has been put into production  
India JSPL 1.9 million Tons 4X72 Holes 4.3m Tamping Coking Project Complete Supervision Project 2008.10-2013.12 has been put into production  
Brazil CVRD 7.5 million tons pellet project supervision project 2008.12-2010.04 has been put into production  
Guanggang-JFE Steel Company 1880 Pickling Cold Rolling, Rewinding and Galvanizing Line Project 2009.03-2011.04 has been put into production  
Complete set of supervision project of the third bar rolling line project of Liugang 2009.07-2010.04 has been put into production  
Supervision Project of Casting and Forging Project in Sinosteel Hengzhong Heavy Industrial Park 2009.08-2010.02 has been put into production  
Liugang 3, 4# CDQ Boiler Project Complete Supervision Project 2009.08-2010.12 has been put into production  
Guangdong Shaogang clean production energy saving transformation project converter steelmaking project supervision project 2010.03-2011.02 has been put into production  
Complete Supervision Project of Phase II Project of Liugang 1250 Cold Rolled Sheet Production Line 2010.09-2012.03 has been put into production  
Complete set of supervision project of heavy steel 2700 plate relocation project 2010.11-2011.04 has been put into production  
Masteel 110 Tons Electric Furnace Project Supervision Project 2011.02-2011.09 has been put into production  
Guangdong Shaogang 130 Tons Converter Steelmaking Project Supervision Project 2011.03-2011.08 has been put into production  
Complete Supervision Project of 1*240 m2 Sintering Project for Post-disaster Reconstruction of Hangang 2011.03-2013.03 has been put into production  
Complete Supervision of 1*240 m2 Sintering Project of Phase II Reconstruction Project of Han Steel 2011.03-2012.12 has been put into production  
Complete Supervision Project of 2.73 million Tons 1580 Hot Rolling Project of Masteel No.4 Steel 2011.03-2013.12 has been put into production  
Turkey TOSYALI 600000 Tons of Bar and Wire and Finishing Project Complete Supervision 2011.03-2014.07 has been put into production  
Liugang Coke Dry Quenching Five-phase Project Complete Supervision Project 2011.06-2011.11 has been put into production  
India 550M2 non-recovery coking project supervision project 2011.06-2012.03 has been put into production  
Guangxi Liugang 3 million Tons 150t Converter Renovation Project Complete Supervision Project 2011.07-2013.04 has been put into production  
Maanshan Iron and Steel (Hefei) Company 1.32 million Tons 1550 Cold Rolling Project Complete Supervision 2011.09-2013.12 has been put into production  
Heavy steel bar line relocation project supervision project 2011.09-2012.07 has been put into production  
Tianjin Ronggang PH Refining Furnace Supervision Project 2011.11-2012.12 has been put into production  
Turkey ICDAS Supercritical Coal-fired Unit Project Complete Supervision Project 2011.11-2013.03 has been put into production  
Liugang No.4 Bar Line 600000 Tons Project Complete Supervision Project 2012.03-2012.08 has been put into production  
Chenggang surplus gas waste heat power generation supervision project 2012.04-2012.11 has been put into production  
South Africa Mine Thermal Waste Heat Power Generation Supervision Project 2012.05-2012.09 has been put into production  
Supervision Project of 4# 1750 M3 Blast Furnace Project for Technical Transformation of Chongqing Steel 2012.05-2013.03 has been put into production  
India ISPAT 1 million Tons 2 × 55 Holes 5.5m Tamping Coking Project Supervision Project 2012.05-2013.06 has been put into production  
Huoqiu Iron Mine Deep Processing 1.2 million Tons of Bar and Wire Engineering Supervision Project 2012.08-2013.09 has been put into production  
Huoqiu 2 × 65-hole 5.5 m Tamping Coking Project Supervision Project 2013.01-2013.10 has been put into production  
Liugang 5. six bar production line project supervision project 2013.01-2013.12 has been put into production  
Huoqiu 1750M3 Blast Furnace Ironmaking Project Supervision Project 2013.01-2014.04 has been put into production  
Australian ROCKLANDS Copper Mineral Processing Supervision Project 2013.01-2014.09 has been put into production  
Supervision Project of Baotou Steel Silicon Steel Co-withdrawal and Re-winding Project 2013.06-2014.12 has been put into production  
Xinjiang Palgang 3.8 million Tons Iron Ore and Supporting Relocation Construction Project Supervision Project 2013.12-2014.09 has been put into production  
Project Supervision of 2000M3 Blast Furnace of Iran ZARAND Integrated Steel Plant 2013.12-2016.01 has been put into production  
Iran ZARAND integrated steel plant 3 × 120t converter steelmaking project supervision project 2014.01-2015.10 has been put into production  
Iran ZARAND integrated steel plant sintering project supervision project 2014.01-2016.01 has been put into production  
Iran ZARAND integrated steel plant raw material yard engineering supervision project 2013.01-2016.01 has been put into production  
Iran ZARAND Integrated Steel Plant Dagong Auxiliary Engineering Supervision Project 2014.01-2016.01 has been put into production  
Canada ESAI 8# furnace through row repair supervision project 2014.06-2015.03 has been put into production  
Xinjiang Guotai Xinhua 2*35MW Power Generation Project Supervision Project 2014.06-2016.06 has been put into production  
Supervision Project of Russian DeRyukyu Project 2014.09-2015.04 has been put into production  
Supervision Project of Shouyang Ethylene Glycol Project of Yangquan Coal Group 2014.12-2016.03 has been put into production  
Taishuo Hejing Supervision Project 2014.12-2015.11 has been put into production  
TRT Supervision Project in Turkey 2014.12-2015.11 has been put into production  
JSPL4 4.3 m Coke Oven Project Supervision in India 2015.02-2019.05 has been put into production  
Algeria 1.95 million Tons of Bar and Wire Engineering Supervision Project 2016.01-2016.12 has been put into production  
Masteel coal coke transformation supervision project 2016.03-2016.06 has been put into production  
Algeria 2.3 million tons of electric furnace steelmaking, continuous casting, lime kiln engineering supervision project 2016.05-2017.08 has been put into production  
Algeria direct reduction iron engineering supervision project 2016.04-2017.05 has been put into production  
Algeria Pellike Engineering Supervision Project 2016.11-2017.10 has been put into production  
XISHangzhuang Power Plant Engineering Supervision Project 2016.12-2017.08 has been put into production  
India JSW steel plant salt engineering supervision project 2016.12-2017.04 has been put into production  
Iran Isfahan Coal Injection Project Supervision Project 2016.12-2018.04 has been put into production  
Supervision Project of MMK2X300m2 Sintering Project in Russia 2017.03-2018.12 has been put into production  
Supervision Project of BR Rare Earth Pilot Project in Australia 2017.06-2018.03 has been put into production  
Algeria Small Steel Supervision Project 2017.08-2018.08 Equipment supply completed  
Turkey Bar Supervision Project 2017.12-2018.04 has been put into production  
Coal Injection Supervision Project in Iran 2017.01-2018.04 has been put into production  
Supervision Project of Malaysia Desintering Raw Material Plant 2017.05-2018.04 has been put into production  
Iran ZARAND Public Auxiliary Supervision Project 2017.06-2017.11 has been put into production  
Supervision Project of Bulk Material Conveying Project in Brazil 2017.04-2017.08 has been put into production  
China Railway Rail Transit Shield Machine Equipment Supervision Project 2017.08-2017.12 has been put into production  
Iran ZARAND Blast Furnace Supervision Project 2017.06-2018.12 has been put into production  
Xuyang Coking Supervision Project 2017.08-2018.09 has been put into production  
liuzhou lime kiln supervision project 2017.11-2018.09 has been put into production  
Supervision Project of Huoqiu Steel Rolling 2018.08-2019.04 has been put into production  
Indonesia Dexin Coking Supervision Project 2018.08-2019.03 has been put into production  
Huoqiu Coking Supervision Project 2018.08-2019.01 has been put into production  
Blast Furnace Supervision Project of Ningsteel 2018.08-2019.06 has been put into production  
Indonesia Dexin Sintering Supervision Project 2018.04-2019.12 has been put into production  
Supervision Project of Dexin Lime Kiln and Raw Material Yard in Indonesia 2018.04-2019.12 has been put into production  
Wuhang steelmaking supervision project 2018.07-2020.11 has been put into production  
Guangxi Shenglong 2000m3 Blast Furnace Supervision Project 2018.07-2019.08 has been put into production  
Supervision Project of Guangxi Shenglong Steelmaking Project 2018.09-2019.09 has been put into production  
Supervision Project of 4 million Tons Pelleting Project of Hegang Leting 2018.12-2020.11 has been put into production  
Indonesia Dexin Sintering Project Supervision Project 2018.04-2019.12 has been put into production  
Indonesia Dexin Lime Kiln and Raw Material Yard Complete Supervision Project 2018.04-2019.12 has been put into production  
Naiman nickel-iron alloy complete set supervision project 2018.10-2019.06 Equipment supply completed  
Fujian Sanming iron and steel 2 million tons pellet project supervision project 2018.12-2019.07 has been put into production  
India JSW 3 million tons coking project supervision project 2019.04-2020.03 Equipment supply completed  
Supervision Project of JSW140t/h CDQ Project in India 2019.04-2019.12 Equipment supply completed  
Turkey Boiler Supervision Project 2019.02-2019.12 Equipment supply completed  
Liugang 3. Four-bar Reconstruction Supervision Project 2019.03-2019.06 has been put into production  
Algeria High-speed Line Supervision Project 2019.03-2019.09 Pause  
Russian Electric Melting Magnesium Project Supervision Project 2019.04-2019.10 has been put into production  
Liugang Fangchenggang Casting Crane Equipment Supervision Project 2019.04-2020.08 Equipment supply completed  
Liugang Fangchenggang Phase I Long Material Supervision Project 2019.04-so far has been put into production  
Fujian Minguang Bar Reconstruction Project Supervision Project 2019.05-2020.03 has been put into production  
Liugang Pellike Supervision Project 2019.09-2020.09 Equipment supply completed  
Algeria Mineral Processing Supervision Project 2019.09-2020.06 Equipment supply completed  
Beneficiation Supervision Project in Bolivia 2019.10-2019.11 Pause  
Lianyuan Steel High Bar Line Supervision Project 2020.03-2020.06 has been put into production  
Guangxi Shenglong Gaogang (Nine Rolling) Supervision Project 2020.03-2020.08 has been put into production  
Shanxi Hongda Steelmaking Supervision Project 2020.04-so far has been put into production  
Zhongxin Pelget Supervision Project 2020.05-2022.07 Equipment supply completed  
Guangdong Jinshenglan steelmaking and continuous casting supervision project 2020.05-so far has been put into production  
Tangshan Huaxi Steelmaking Supervision Project 2020.05-so far has been put into production  
Supervision Project of Boiler Blast Station in Turkey 2020.05-2020.11 has been put into production  
Russian MMK Coking Supervision Project 2020.11-so far In system  
Hubei Jinshenglan Blast Furnace Supervision Project 2020.11-so far has been put into production  
South Africa Bakubung Platinum Mine Concentrator Supervision Project 2020.02-so far has been put into production  
Supervision Project of Hegang Leting 2020.12-so far has been put into production  
Kunming Iron and Steel Pellike Supervision Project 2020.12-so far has been put into production  
Maanshan Iron & Steel Pellike Supervision Project 2020.12-so far has been put into production  
Jinxi Line 3 Reconstruction and Jinxi Steel Sheet Pile Reconstruction Project 2020.12-so far has been put into production  
Shanxi Jianbang General Supervision Project 2021.01-so far Equipment supply completed  
Minguang Bar Supervision Project 2021.01-so far has been put into production  
Shehong Chuanzhong Bar High-speed Line Supervision Project 2021.3-so far has been put into production  
Supervision Project of Guangxi Shenglong Gaogang (Tenth Rolling) 2021.03-so far has been put into production  
Turkey 1800 Hot Rolling Project 2020.11-so far has been put into production  
Coking and Coal Preparation Coke Furnace Project of Fangchenggang Iron and Steel Base Project 2018.10-2021.02 has been put into production  
Guangxi Shenglong Industrial Upgrading and Technological Transformation Project Ironmaking, Sintering and Steelmaking Project 2018.03-2020.03 has been put into production  
Hebei Jinxi Iron and Steel Group Co., Ltd. Equipment Upgrading Project 2X2000m ³ Blast Furnace Project 2019.11-2019.12 has been put into production  
Fujian Sangang Minguang Pelget Project 2018.11-2020.01 has been put into production  
Hegang Chenggang Ironmaking Division coking coal material field shed environmental protection project 2018.09-2018.09 has been put into production  
Xinjiang Guotai Xinhua 2*350000 MW Power Generation Project 2017.01-2019.10 has been put into production  
Yangquan Coal Industry (Group) Co., Ltd. No.2 Mine Sangzhan Var Wind Oxidation Power Generation Project 2017.03-2020.11 has been put into production  
Fujian Sangang Minguang Co., Ltd. a bar single line control rolling transformation project. 2018.11-2020.01 has been put into production  
Yangmei No.2 Mine Sangzhang Var Wind Oxidation Power Generation Project 2017.03-2020.11 has been put into production  
Shandong Iron and Steel Laiwu Branch of the old area sintering machine environmental protection relocation technical transformation project newly built 2 × 480m2
Sintering Machine and Its Supporting Works
2019.07-2020.11 has been put into production  
Qinzhou Guanggang High Speed Bar Transformation Project 2019.11-2021.01 has been put into production  
Cangzhou China Railway Equipment Manufacturing Materials Co., Ltd. Sintering Machine Head Electric Precipitator Ash Resource Utilization Project 2020.09-2021.05 has been put into production  
Algeria Integrated Steel Plant Director Belt Project 2018.8-2020.12 has been put into production  
Civil Engineering Project of Tubular Belt Machine Outside the Factory in Malaysia 2019.07-2020.05 has been put into production  
"Jiaolong" 7000-meter manned submersible project supervision service 2003.06-2012.12 has been put into production Development Department
"Deep Sea Warrior" 4500-meter manned submersible project supervision service 2014.01-2017.12 has been put into production Development Department
"Qianlong II" 4500 meters deep sea resources independent survey system project supervision service 2011.11-2015.12 has been put into production Development Department
"Haima" 4500-meter deep-sea operation system project supervision service 2010.11-2014.12 has been put into production Development Department
Project Supervision Service of "Seafloor Observation Network" Test System 2013.07-2017.12 has been put into production Development Department
"Haidou No.1" All-Sea Deep Autonomous Remote Control Submersible Project Supervision Service 2018.05-2020.12 has been put into production Development Department
Project Supervision Service for the Whole Sea Deep Unmanned Submersible 2019.07-2020.12 has been put into production Development Department
"Haiyan" long-range underwater glider project supervision service 2017.03-2021.02 has been put into production Development Department
"Sea Wing" Networking Long Range Underwater Glider Project Supervision Service 2018.05-2020.12 has been put into production Development Department
"Struggler" full-sea deep manned submersible project supervision service 2016.11-2020.12 has been put into production Development Department
Deep-sea polymetallic nodule mining test engineering supervision service 2019.07-2020.12 has been put into production Development Department
13th Five-Year National Key R & D Plan Shared Voyage Supervision Service 2018.03-2020.12 has been put into production Development Department
National Key R & D Program "Marine Environmental Security" Key Special Supervision Service 2018.03-2020.12 has been put into production Development Department
Egang surplus gas power generation project-project settlement 2012.07-2012.08 has been put into production Fee Control Department
Egang sintering waste heat power generation project-project settlement 2012.09-2012.11 has been put into production Fee Control Department
Huoqiu 3 million tons of annual steel project-coking project-construction whole process budget control and settlement. 2013.02-2017.05 has been put into production Fee Control Department
Huoqiu 3 million tons of annual steel project-ironmaking project-construction whole process budget control and settlement. 2013.02-2017.05 has been put into production Fee Control Department
Huoqiu 3 million tons of annual steel project-steel rolling project-construction whole process budget control and settlement. 2013.02-2017.05 has been put into production Fee Control Department
Huoqiu 3 million tons of annual steel project-gas external network project-construction of the whole process of budget control and settlement. 2013.02-2017.05 has been put into production Fee Control Department
West Shangzhuang 2*660MW low calorific value coal thermal power project engineering-construction whole process budget control and settlement 2013.02 so far Executing Fee Control Department
Inner Mongolia Wastewater Treatment Plant-Bid Budget 2013.09-2013.10 has been put into production Fee Control Department
Liugang medium rolling mill product structure adjustment technical transformation project (four bars and five or six bars)-project settlement. 2013.10-2014.05 has been put into production Fee Control Department
Dingzhou Tianlu New Energy Co., Ltd. new coking project-construction whole process budget control and settlement. 2013.11-2014.12 has been put into production Fee Control Department
Xinjiang Shankai Company Palgang Iron Mine 3.8 million t/a Concentrator Project-Budget Control and Settlement of the Whole Construction Process 2013.11-2016.05 has been put into production Fee Control Department
Ethiopia Sewage Treatment Plant-Bid Budget 2014.04-2014.05 has been put into production Fee Control Department
Liugang Coke Dry Quenching 3 Coke and 4 Coke Project-Project Settlement 2014.04-2014.12 has been put into production Fee Control Department
Cangzhou vertical and horizontal coking project-construction whole process budget control and settlement. 2014.06-2016.03 has been put into production Fee Control Department
Chengde surplus gas power generation project-project settlement 2014.07-2014.12 has been put into production Fee Control Department
Tianjin Ronggang Sintering Project-Engineering Settlement 2014.09-2014.12 has been put into production Fee Control Department
Iran Zaland Integrated Steel Plant Project-Materials Plan 2014.09-2015.12 has been put into production Fee Control Department
Henan Ancai High-tech Waste Heat Power Generation Reconstruction Project-Project Settlement 2014.12-2015.02 has been put into production Fee Control Department
Guangxi Coal Moisture-control Project-Project Settlement 2015.01-2018.01 has been put into production Fee Control Department
Saudi villa project-budget control and settlement of the whole construction process. 2015.02-2015.12 has been put into production Fee Control Department
Shanxi Shouyang Ethylene Glycol Project-Budget Control and Settlement of the Whole Construction Process 2015.02-2019.01 has been put into production Fee Control Department
WISCO Thermal Power Plant No.07 Power Station Reconstruction and Expansion General Contracting Project-Project Settlement 2015.02-2015.11 has been put into production Fee Control Department
MINE ENGINEERING ALUMINA-BID BUDGET 2015.06-2015.08 has been put into production Fee Control Department
Chengde 40000Nm ³/h Oxygen Station Project-Project Settlement 2015.06-2015.12 has been put into production Fee Control Department
Cangzhou China Railway Equipment 2 × 300th Boiler Unit 5# and 6# Desulfurization and Denitrification Project General Contracting Project-Construction
Whole Process Budget Control and Settlement
2016.03-2016.03 has been put into production Fee Control Department
Iron sintering ash resource utilization project-construction whole process budget control and settlement. 2016.05-2016.09 has been put into production Fee Control Department
Algeria TOSYALI DRI Project-Budget Control and Settlement of the Whole Construction Process 2016.08-2020.12 has been put into production Fee Control Department
Algeria AQS DRI Project-Budget Control and Settlement of the Whole Construction Process 2017.01-2020.02 has been put into production Fee Control Department
Algeria TOSYALI Steelmaking Project-Budget Control and Settlement of the Whole Construction Process 2017.02-2019.03 has been put into production Fee Control Department
Algeria TOSYALI pellet project-budget control and settlement of the whole construction process 2017.04-2020.12 has been put into production Fee Control Department
Algeria AQS LMP Project-Budget Control and Settlement of the Whole Construction Process 2017.09-2019.12 has been put into production Fee Control Department
Algeria TOSYALI Rolling Project-Engineering Settlement 2017.09-2017.12 has been put into production Fee Control Department
Hegang Leting Iron and Steel 2*4.8 million Tons Pelleting Project-Budget Control and Settlement of the Whole Construction Process 2018.07- has been put into production Fee Control Department
Sangzhang Bridge Wind Project-Budget Control and Settlement of the Whole Construction Process 2018.07-2020.05 has been put into production Fee Control Department
Algeria TOSYALI Long Belt Project-Budget Control and Settlement of the Whole Construction Process 2018.08-2023.06 has been put into production Fee Control Department
Liunan Flux (Phase I) Project EPC Project-Project Settlement 2018.11-2022.07 has been put into production Fee Control Department
Xinjiang Guotai Xinhua Power Plant Project-Project Settlement 2019.08-2019.12 has been put into production Fee Control Department
Fujian Sangang Minguang Pelball Project-Project Settlement 2020.02-2020.11 has been put into production Fee Control Department
Hejin Hongda Special Steel Co., Ltd. 2*100 Tons Converter Steelmaking Project-Budget Control and Settlement of the Whole Construction Process 2020.03-2020.11 has been put into production Fee Control Department
New China Pelget Project-Budget Control and Settlement of the Whole Construction Process 2020.12-2022.03 has been put into production Fee Control Department
Algeria Mineral Processing Project (Phase I)-Budget Control and Settlement of the Whole Construction Process 2019-2023.06 has been put into production Fee Control Department
Shanxi Hejin Hongda Steel Rolling Project-Construction Whole Process Budget Control. 2022.02-2023.06 has been put into production Fee Control Department
Hydrogen-rich carbon cycle blast furnace phase III project heating project (electric heating)-construction whole process budget control and settlement. 2022.01-2023.06 has been put into production Fee Control Department
Maanshan Iron and Steel Co., Ltd. Ironmaking General Plant (Southern District) Belt Roasting Machine Project-Budget Control and Settlement of the Whole Construction Process 2022.01-2023.06 has been put into production Fee Control Department
Algeria Mineral Processing Project (Phase II)-Budget Control and Settlement of the Whole Construction Process 2023.06- In execution Fee Control Department
Shaanxi Hanzhong Iron and Steel Group Co. 2021.06- Project Pause Fee Control Department
Demonstration Project of Hydrogen Energy Development and Utilization Project of Hebei Zhangxuan High-tech Technology Co., Ltd.
(Annual output of 550000 tons of high quality deoxygenated pellets project)-Budget control and settlement of the whole construction process.
2021.06- In execution Fee Control Department
Hubei Youke Coking Project-Budget Control and Settlement of the Whole Construction Process 2022.01- In execution Fee Control Department
Algeria Steel Rolling Project-Budget Control of the Whole Construction Process 2022.05- In execution Fee Control Department
Indonesia Dexin 1.3 million Tons Coking Project-Coking System Construction and Safety Settlement 2022.12- In execution Fee Control Department
Fujian Longgang pellet-budget control of the whole construction process 2022.03- In execution Fee Control Department
Huaibei coal gangue building materials comprehensive utilization project-engineering quantity calculation and settlement 2023.05- In execution Fee Control Department
Cangzhou vertical and horizontal oxygen production project-budget control of the whole construction process 2022.11- In execution Fee Control Department
Russia MMK Coking Project-Budget Control of the Whole Construction Process 2021.12- In execution Fee Control Department
Bolivia ESM Integrated Steel Plant-Steel Tie Project-Construction Process Budget Control 2023.08- In execution Fee Control Department